£160m renewable energy plant with biomass station, Lincolnshire for client Eco2

Acuity acted on the construction of a £160 million renewable energy plant near Brigg, North Lincolnshire to comprise a biomass fired power station, with the primary fuel being straw. The plant is to be built on a site comprising circa 5.26 hectares of land which has a history of industrial use. Acuity negotiated with individual landowners (as well as their agent and solicitors) on extensive and complex documentation to secure the relevant rights over the land including advising on challenging power supply and easement issues.